Skip to content
cameron@gordon:~$
Career timeline

// Experience

Tesla

Display Electrical Engineering Co-op

Jan 2022Aug 2022 · Palo Alto, CA · tesla.com

Redesigned display circuit boards now shipping in Model 3, Y, S, and X production vehicles — from schematic through validation and release to manufacturing.

>15%
board cost reduction
+15%
validation throughput
4
vehicle programs

What I did

  • Redesigned display PCBAs for Model 3/Y/S/X production vehicles — schematic, layout, and validation — with the boards released to mass manufacturing.
  • Designed out end-of-life, supply-chain-constrained ICs while improving thermal management and signal integrity, cutting board cost by over 15%.
  • Optimized mass-production validation through hundreds of Design of Experiments (DOEs) with global vendors, cutting validation time and boosting throughput 15%.
  • Scripted firmware and validation tooling to accelerate board bring-up across display variants.
PCB DesignDesign for ManufacturingSignal IntegrityThermal ManagementValidation Engineering
Tesla headquarters in Palo Alto, California
Tesla headquarters in Palo Alto, California